Precious metal Plating-Line

Project description

Precious metal Plating- Line

  • Line set-up: 2 lines
  • Circulating-air dryer with 4 work positions and dehumidifying module
  • Pretreatment with ultrasonic system
  • Electronic rectifiers  7 side arm hoists for automatic transport
  • 85 processing positions, incl. 31 storage positions and 2 spare tanks
  • Cross transfer dry/wet  6 separate agitations
  • Frequency converters for variable drive, lift and agitation
  • Hoist positioning in the direction of travel by laser measurement
  • Universal construction of tank  Removable blind in active tanks
  • Economical water system „rinse when necessary“
  • Safety start-up protection on hoists with surface laser
  • pH-measuring flightbar  Gold recovery in rinse tank
  • Automatic filling of rinse tanks
  • Retrofit ability for loading and unloading by robot

Control system features

  • Based on Siemens S7 PLC
  • System supervised by radio remote control
  • Dip sequences freely programmable
  • Article specified control of ultrasonic
    system, flow control of pump systems,
    dipping of goods
  • On-screen information re production and
    plant operation
  • Goods check-in via bar codes
  • Support via modem

Key data

space requirements

16 x 6 x 3,7 Meter

construction year

2012

inside dimensions (rinsing tank)

200 x 900 x 950 mm

capacity

3,3 min

ProjectEdelmetallautomat